LaeBay
LaeBay
02-02-2016
Mathematics
contestada
Find the area of the trapezoid.
Respuesta :
H8SH33M
H8SH33M
02-02-2016
The top base is :
14mm
The bottom base is:
36mm
The height is:
15mm
First you need to add the
top
and
bottom
bases together and divide it by
2
(14mm
+
36mm) / 2
= 50mm/2
=25mm
Then you need to times it by the
height
25mm x 15mm = 375mm^2
Answer Link
AL2006
AL2006
02-02-2016
The area of any trapezoid is
(1/2) (height) (sum of the bases) .
For the trapezoid in the picture:
The height = 15 mm
One base = 14 mm
The other base = 36 mm
-- Add the two bases.
-- Multiply the sum by the height.
-- Take 1/2 of the product.
The result is the area.
Answer Link
VER TODAS LAS RESPUESTAS ( 91+ )
Otras preguntas
The conversion of the fatty acid palmitate (c16) to carbon dioxide via β-oxidation, the citric acid cycle and oxidative phosphorylation yield approximately ____
If, for example, you were hired, or you volunteered, to trim down the bureaucracy to save the country from financial bankruptcy, which agencies/programs in the
A spinner is labeled with the numbers 1,2,3,4,5,6,7,8, & 9. Calculate the: a. odds of spinning a 3 b. odds of not spinning a 9 c. odds of spinning an even
Which of these organisms experience the highest rate of cellular respiration due to activity levelsA. PlantsB. Protozoa C. AnimalsD. Fungi
Cassidy is planning to obtain a loan from her bank for $210,000 for a new home. the bank has approved cassidy’s loan at a fixed annual interest rate of 2.7% com
Carson company sells sporting tickets in advance of the event for $500,000. The journal entry to record the sale is?
Solve the proportion. A. 12 B. 2 C. 8 D. 16
Lance's taxable income last year was $65,350. According to the tax table below, how much tax does he have to pay if he files with the "Single" status?
) Organizations must balance good performance with responsibility to key three policies: social, economic and environmental. Demonstrate how this relates to st
A manager is concerned that there isn’t enough time spent on production and too much time spent on setups. The manager decides to double all production batch si