isaiahhardei7270 isaiahhardei7270
  • 03-09-2017
  • Business
contestada

When a manager compares employees to each other rather than to job performance standards in the performance review process, this is known as what type of rater error __________. contrast errors recency errors rater bias errors central tendency errors?

Respuesta :

triplef709ovovpi triplef709ovovpi
  • 03-09-2017
The answer is Contrast error
Answer Link

Otras preguntas

Can someone answer this question? :)
Katlyn made 4 dresses with 7 yards of fabric. How many yards did she use on 1 dress?
In a heat engine if 1000 j of heat enters the system the piston does 500 j of work, what is the final internal energy of the system if the initial energy was 20
How many pairs of chromosomes do human body cells contain?
what fraction of high school seniors in the united states admit to drinking alcohol
Bone-strengthening physical activity done _____ increases bone-mineral content and bone density in youth.
What mass of carbon dioxide is produced from the complete combustion of 4.50×10−3 g of methane?
Please please help please
Movie $5.50 Soda $1.75 Popcorn $2.25 Candy Bar $1.10 Jeffrey left home with $20 in his wallet. He had a quick lunch that cost $8.47 and went to the movie t
Which region was under the control of the Soviet Union