ridume2020 ridume2020
  • 02-01-2024
  • Mathematics
contestada

Montu finishes a piece of work in 24 days. How much work will he complete in 8 days?​

Respuesta :

ahmedmaham984
ahmedmaham984 ahmedmaham984
  • 02-01-2024

Answer:

Therefore, he will complete 1/3 of the work in 8 days as 24 ÷ 8 = 3.

Answer Link

Otras preguntas

when may fertilization of an egg occur
70000000000x50000000000000
Barry’s pet turtle, Turtlelini, escaped from his backyard. Barry found Turtlelini by the creek and wanted to determine how far Turtlelini had walked. On the map
Help? You are studying an outcrop where the lower layer is limestone and the layer directly on top of the limestone is sandstone. Near the bottom of the sandsto
The term sexual literacy is defined as the knowledge and skills needed to promote and protect sexual well-being. Learning about sexuality and the sexual body ma
five examples of internal and external layers of the structure of the earth {5marks}
A small publishing company is planning to publish a new book. The production costs will include one-time fixed costs (such as editing) and variable costs (such
(x+1)(x−1)(x−5)=0 HELP
Which of the following is the solution set of the given equation? (x - 3) - 2(x + 6) = -5 a) {-4} b) {8} c) {-10}
Costs that are capitalized because they are expected to have future value are called product costs; costs that are expensed are called period costs. This classi