fandox
fandox fandox
  • 02-06-2017
  • Mathematics
contestada

If it takes 4 men 6 hours to repair a road, How long will it take 3 men to do the job if they work at the same rate ? A) 5 hours B) 6 hours C) 8 hours D) 9 hours

Respuesta :

Аноним Аноним
  • 02-06-2017
answer is C) 8 hours

hope it helps
Answer Link
shanobaigwa
shanobaigwa shanobaigwa
  • 07-08-2021

Answer:

step 1 : 4men = 6 hrs

3 men =  ?

step 2 : 4 times 6 = 24

step 3 : 24 divided by 3 = 8

ANSWER: 8 hours (c)

Answer Link

Otras preguntas

A planet in our solar system is located far from the sun describe the size and composition of the planet
how does the engraving tell a different story from the above description of the boston massacre
What is 9m + 2 = 3m - 10
How did Columbus and Coronado,being entrepreneurs how did it help them make their expeditions possible?
how can a decimal be converted to percentage?
sean makes 2 pizzas. he gives 8 people an equal share of the pizza. how much does each person get?
Disruptive selection events select for _______. a. common traits b. genetic uniformity c. camouflage traits d. extreme traits
Which Cold War incident broke off important talks between Eisenhower and Khrushchev in 1960?
5 consecutive intergers whose sum is 195
martian periodic table