emelymartinez emelymartinez
  • 01-03-2017
  • Mathematics
contestada

An experienced carpenter could build a house in 5 days. How much would he have finished if he worked for 3 days?

Respuesta :

MIniNAchoz
MIniNAchoz MIniNAchoz
  • 01-03-2017
I think it would most likely be  3/5
Answer Link
snoopynfriends
snoopynfriends snoopynfriends
  • 01-03-2017
he would have 8 this is the answer
Answer Link

Otras preguntas

how many nitrogen atoms are in 18.8 g of barium nitride
Tyler Company applies manufacturing overhead to production at the rate of $4.9 per direct labor hour and ended August with $12,900 underapplied overhead. Actual
blood consists of which fluid medium a.lymphb.plateletsc.plasmad.all of these​
Name the cell type responsible formyelination in the CNS
Consider the exchange rate between Peru and Pakistan. Typically exchange rates vary over time, sometimes quite dramatically. The following list presents variou
How do you write 5.44 in words?
Define a function readList with one parameter, the (string) name of a file to be read from. The file consists of integers, one per line. The function should ret
Can someone help find the domain and range
Unless otherwise posted, the speed limit for cars in a residential area is A: 25 miles per hour B: 30 miles per hour. C: 35 miles per hour.
How many moles of gaseous boron trifluoride, BF3, are contained in a 4.3421 L bulb at 787.9 K if the pressure is 1.218 atm?