In a project network, the critical path is the sequence of activities which has the:________.

Respuesta :

66hello60
66hello60 66hello60
  • 03-08-2022

Answer:

The correct answer is the longest time

Answer Link

Otras preguntas

Suzy has 7 separate rings as shown in the figure on the left. She wants to make one open chain as shown in the figure on the right. What is the least number of
JAVA Write a program that prompts the user to enter a year and the first three letters of a month name (with the first letter in uppercase) and displays the nu
a) find the value of 2x+y wehn x =4 and y =3 b) find the value of a^2 + b when a = -2 and b = 5
5) Find the area of the region R that lies inside the cardioid r = 2(1+cos0) and outside the circle r = 3
The impeller shaft of a fluid agitator transmits 28 kW at 440 rpm. If the allowable shear stress in the impeller shaft must be limited to 80 MPa, determine(a) t
how does the atomic mass of oxygen becomes 16??? pls answer ill mark u as brainliest
The line for which equation has negative slope?
The controller of a chain of toy stores is interested in determining whether there is any difference in the weekly sales of store 1 and store 2. The weekly sale
Built-Tight is preparing its master budget for the quarter ended September 30. Budgeted sales and cash payments for product costs for the quarter follow. July
If the sin 30° = one half, then the cos 60° = ________.