a piece of work can be finished in 8 days, what part of the work is done in 2 days​

Respuesta :

kaseyafa
kaseyafa kaseyafa
  • 03-02-2022

Answer:

1/4 of the work

Step-by-step explanation:

A quarter (1/4) of the work is done in 2 days. Let's break it down:

Work can be finished in 8 days total so with 2 days it is only partially completed. If we set it up as 2/8 we can simplify to get 1/4. Therefore, we know only a quarter of the work is done so far.

Answer Link

Otras preguntas

Add 4x4 + 7x3 + 15x2 + 4 and 4x3 + 2x2 + 17x. A) 4x4 + 4x3 + 2x2 + 17x + 4 B) 4x4 + 7x3 + 17x2 + 17x C) x4 + x3 + 17x2 + 17x + 4 D) 4x4 + 11
A summary needs proper documentation because it's relating someone else's idea while at the same time        A. shortening the material.   B. directly quoting f
4-0.25g+0.5h when g=10 and h=5
solve for x with a degree of 30 & side of 300ft
Help me plz tell me the steps to it read the Question 22 points thank you
which inequality is represented by the number line graph? A) x>4B) x<4C) x_>4D) x_<4
Evaluating quadratic functions using
In the case below, the original source material is given along with a sample of student work. determine the type of plagiarism by clicking the appropriate radio
Element X has two isotopes. The table gives information about these isotopes. Isotope Atomic Mass (amu) Abundance (%) X-63 62.9296 69.
I'm so lost, someone please help