hopsonjackie5492 hopsonjackie5492
  • 03-11-2021
  • Business
contestada

when preparing a flexible budget, variable costs are expressed as a constant amount _____, and fixed costs are expressed as a constant amount _____.

Respuesta :

kyliealexisortiz kyliealexisortiz
  • 10-11-2021

Answer: per unit; in total

Explanation:

Answer Link

Otras preguntas

What is 0.1 times 30
the value of x=4 is the solution to all following equation except witch? 2x+7=15 x+5=3x-3 3(x+1)=x+11 or x+12=5x-2
A possible explanation, or ____________________, may be tested by experimentation.
a train traveled 360 miles in 6 hours. how many miles per hour did the train travel?
One number is 12 more than half another number. The two numbers total 60. Find the numbers.
round 141.999 to the nearest tenth
What is 101x9 please answer
In ∆ABC, which ratio equals cos C?
Explain why the dodo was placed in the kingdom animalia
a pizza parlor has 8 different toppings and 3 different cheeses to choose from on the menu. how many pizza combinations are possible if each pizza has 1 toppin