sukriti009
sukriti009 sukriti009
  • 03-09-2021
  • Mathematics
contestada

32 workers can complete a work in 30 days working 6 hours per day. How many days are required to complete the
same work by 16 workers working 8 hours per day?

Respuesta :

Tasyha
Tasyha Tasyha
  • 03-09-2021

Answer:

45 days

Step-by-step explanation:

[tex]32 \times 30 \times 6 \div (16 \times 8) [/tex]

[tex]5760 \div 128[/tex]

[tex]\boxed{\green{ = 45}}[/tex]

Answer Link

Otras preguntas

1. Why did people flock to New Mexico between 1880 and 1940?
sics and Chemistry A (2nd Six Weeks) - SC3200SFA/01 Analyzing Kinetic energy A yellow ball with a mass of 2 kg is rolling across the floor at 3 m/s. A red ball
Vivid words used to describe dramatic sights, sounds or feelings
To clean away chips of metal and wood from the tabletop of a bench a student should always use
what is community what is community ​
What is Mrs.Moss’ problem in this story?
• A fraction multiplied by its reciprocal has a product of​
Which of the following IS NOT a name for the cell membrane? Cellular Envelope Phospholipid Bilayer Fluid Mosaic Model Plasma Membrane
A school's right to search student's lockers to keep things safe for the community might be a necessary thing
Describe the role of Constantine and Roman emperors who followed him, in spreading Christianity.