Ahmatsuper Ahmatsuper
  • 01-02-2021
  • Mathematics
contestada

A construction company can remove 25,200 pounds of dirt from a construction site in 8 hours.

Respuesta :

1726890 1726890
  • 02-02-2021

Answer:

yes they can how efficient

Step-by-step explanation:

Answer Link

Otras preguntas

Rae is training for cheerleading, so she starts rollerblading for 45 minutes each day. Her heart rate reaches 128 beats per minute, but her target heart rate zo
Read the sentence. Some activists for civil rights registered their feelings by means of protest. What is the object of the preposition by means of?
how many stars is in the united states of america
the mean is A: Sometimes B: always C: never
what is 12.5% of 150
8×5+8×1-2×6+6-2 add parentheses to get the value of 22
With a mother that is colorblind and a father that is not colorblind, what is the probability that a male child is colorblind? A. 0 B. 1/4 C. 1/2 D. 1
Solve. 3x + 7 = 22 –29 –5 5 7
Mi primo y yo conocemos a los jugadores del real madrid. Ellos A) son espanol B) somos espanol C) son spanoles D) somos espanoles
What type of three-dimensional figure will this net make?