Monkeyfeet Monkeyfeet
  • 03-10-2020
  • Mathematics
contestada

A construction company needs to remove 24 tons of dirt from a construction site. They can remove 3/4 tons of dirt each hour. How long will take to remove the dirt? Write your answer in hours.

Respuesta :

zaynah29cfc
zaynah29cfc zaynah29cfc
  • 03-10-2020

Answer: 32 hours?

Step-by-step explanation:

24 / (3/4) = 32

Answer Link

Otras preguntas

Be sure to label your answer.
What is universal theme?
How long does wisdom teeth laughing gas last?
2. It is safe to give and receive blood in the United States. True False
If (f + g)(x) = 3x2 + 2x – 1 and g(x) = 2x – 2, what is f(x)?
What is the role of bacteria in lichens?
Why does Capulet think the following exchange is so funny?Capulet. Make haste, make haste. Sirrah, fetch drier logs: Call Peter, he will show thee where they ar
A laser used to dazzle the audience at a rock concert emits blue light with a wavelength of 463 nm . calculate the frequency of the light.
Why were prominent american writers of the 1920s called the "lost generation"
In my block of 100 flats a painter is kept employed by painting one flat each month from January to November. The flats are painted in the same order and he tak