luismedina0716 luismedina0716
  • 03-06-2020
  • Physics
contestada

Select the correct answer.
What is the value of work done on an object when a 70-newton force moves it 9.0 meters in the same direction as the force?

Respuesta :

travismcclain07
travismcclain07 travismcclain07
  • 12-06-2020

Answer: 9.0 meters

Explanation:

Answer Link

Otras preguntas

Your family would like to develop healthier eating habits. Which of the following strategies would be the best approach to reaching that goal? A. Replace all t
In "A Poison Tree," what is one way that the speaker helps readers imagine how his anger grew? A. He describes how he "stole" into his foe's garden because
Simplify the expression: 2.75j + 2.25 - 1.5j + 3 A) 4.25j + 5.25 B) 1.25j + 5.25 C) 1.25j - 0.75 D) 1.75j - 0.75
What times what gives you 36?
why is faulting most likely to occur near earth's surface and not deep within earth ?
Describe the difference between a debit card and a credit card. Explain how using a credit card can be a responsible decision, an irresponsible decision, or bot
A student runs 100 meters in 11 seconds. What is the speed of the student?
Through: (0,2)and (-3,-5)
in the alternation of generations life cycle fertilization requires two?
Quick Fun Answer What times 5 equal 125?