diamondgray8365 diamondgray8365
  • 02-01-2020
  • Computers and Technology
contestada

Of the listed principles, which one states that multiple changes made to computer systems shouldn’t be made simultaneously?

Respuesta :

Limosa
Limosa Limosa
  • 03-01-2020

Answer:

Change management is the correct answer to the following question

Explanation:

The following question is true because change management is the principle that is listed on that multiple alteration which is not made to the computer system simultaneously and it is aimed at that users which is impacted by the change. Change management is responsible for all the products that are related to computer operations.

Answer Link

Otras preguntas

Two kilograms of ground cinnamon is packaged into bags containing 38 g each . There will also be some cinnamon left over . How many bags will there be
What is the most important distinction between the membrane transporters known as channel proteins and those known as carrier proteins?
Hiro is creating a smaller scaled replica of a triangular canvas. Which of the following expressions will help him determine the length of segment AB? AB =
use 10 point bins 90-99 and 80-89
Why did indians call for independence after world war 1?
Which phrase signals a cause-and-effect relationship? A) who use B) to prevent C) and thus D) they were
Find the height of a square pyramid with volume 37.3 ft3 and dimensions of base 4 ft by 4 ft. Please help!
what is the OSHA color coding system​
In △ABC, m∠A=15°, a=9, and b=12. Find c to the nearest tenth.
Determine the molarity of a solution formed by dissolving 97.7 g libr in enough water to yield 750.0 ml of solution.