hectorcal1143 hectorcal1143
  • 04-09-2019
  • Computers and Technology
contestada

_________ is the biggest problem you can face if you don’t identify the scope of your risk management project. Scope creep Noncompliance System failure Nonrepudiation

Respuesta :

Numenius
Numenius Numenius
  • 12-09-2019

Answer: Scope creep

Explanation:

 Scope creep in the project management basically refers to the uncontrolled development or growth in the project creep. It basically occur when the project scope are not appropriately defined.

It usually involve lack of change in the control system and increase the complexity of the project. It is also has poor requirement analysis.

So, that is why it is the biggest problem we usually face in the project management.

Answer Link

Otras preguntas

To find a baseball pitcher's earned average (ERA), you can use the formula Ei=9r where E represents ERA, i represents the number of innings pitched, and r repre
Solve for y: 11-1/2y=3+6x
qué es "la natilla"?
what is the value of the expression? [(1 5)⋅2−5]⋅2
Which property is illustrated by the equation below? 5/6 x 6/5=1 A. Additive Inverse Property B. Distributive Property C. Associative Property of Multiplicatio
what is the inverse of the function f(x) = -5x^2 3, for x>or equal to 0?
All the genes of all members of a particular population make up the populations ? A.genotype B.phenotype C.gene pool D.relative frequency
is topaz organic or inorganic
if a < b and c < d is this valid? a/c < b/d
Citizens hold all the political power is a