Ansel6896 Ansel6896
  • 02-09-2019
  • Business
contestada

When direct materials are used in production, costs are assigned by debiting Work-In-Process Inventory and crediting __________.

Respuesta :

sebastian2019 sebastian2019
  • 02-09-2019

Answer:

finished goods

Explanation:

I would assume finished goods. At a multiple process step company, you would again credit WIP materials

Answer Link

Otras preguntas

In order to prevent bacteria and fungi from reducing the volume of organic matter, coal must experience ____, ____ burial.
Which system of equations is equivalent to the system of equations shown? 2x - 4y = 12 3x - 5y = 20 A) 5x - 9y = 32 and 6x - 10y = 40 B) 5x + 9y = 32 and 6x
In most small electric motors, the magnets that are around the central rotor (the field magnets) are _________________. The magnet in the center is a(n) _______
If Erin gets $5 per week for allowance, how much money will she receive after 6 weeks?
Solve for x: 2logx=log64
if a solution such as acetic acid spills on a counter
What tactic did senators use to try block the passage of the civil rights act of 1964 for more than two months?
How do I use gland and hormone in the same sentence?
-6 c squared times 2 c squared - 3 C
135 students added 5 students a total of 140 what is the percentage