Deuce6694 Deuce6694
  • 02-09-2019
  • Social Studies
contestada

Which two actions are part of the Scrum Master's role in PI Planning?

Respuesta :

rejkjavik rejkjavik
  • 12-09-2019

Answer:

1) time spent on analyzing every story is more

2) part timer scrum master are not much have proper time to plan

Explanation:

scrum is a lean system engineering rtechniques

the two action that are the crucial part of scrum master's role in PI planning is

1) time spent on analyzing every story is more than the other part

2)part timer which work as a scrum master do not have proper time slot to plan as important member of team.  

Answer Link

Otras preguntas

Was the Gold Rush a good or bad thing for the United States?
When was World War I?
What two major processes are involved in the oxygen cycle?
What is Sir Francis Drake hardships
What two major processes are involved in the oxygen cycle?
A child is standing across the street from his apartment . His mother is on their balcony . The angle of elevation between the child's eyes and his mothers eyes
When was William Shakespeare born
A 1 digit number and a 3 digit number have a sum of 205.  The same two number have a difference of 195, a product of 1,000 and a quotient of 40.  What are the t
A passenger on a boat moving at 1.70 m/s on a still lake walks up a flight of stairs at a speed of 0.60 m/s , as shown in the figure . The stairs are angled at
in an expression(8/9) squared (-81)+3/5dividedby-9/10