liluv4590 liluv4590
  • 02-04-2019
  • Mathematics
contestada

A potter works 4 days a week, makes 14 pots per day on average, and charges $24 a pot. Money per 4-day workweek?

Respuesta :

greubel80
greubel80 greubel80
  • 02-04-2019
Step by Step:

14 average pots x 4 days a week = average money made

14x4= 56

56 pots a 4-day week x 24$ a pot

56x24 = 1344$
Answer Link

Otras preguntas

Multiply. Write your answer in simplest form. 2 5/6x2/5
When did the constitution give all adult men the right to vote?.
This figure represents a flower box. How much soil will it take to fill the flower box? Enter your answer in the box. in³ Three-dimensional figure that could b
Financial assistance from the government to citizens in the form of tax credits or monetary payments is called
read this sentence from "President Obama's Third Annual Back to School Speech.” Down the road, those will be the traits that will help you succeed, as well -- t
9x + 7 ≥ 54 x ≥ __ Solve pls
???????????????????????help
Which function is a quadratic function? u(x) = –x 3x2 – 8 v(x) = 2x2 8x3 9x y(x) = x2 3x5 4 z(x) = 7x2 2x3 – 3.
Which sport shows the greatest variability in players’ heights? which sport shows the least variability?
The regular price of an item is s dollars. If the item is on sale for 25% off the regular price, which expression represents the sale price, in dollars, of the