Chan592 Chan592
  • 03-02-2019
  • Physics
contestada

Determine the amount of work done when a crane lifts a 100-N block form 2m above the ground to 6m above the ground

Respuesta :

hrzlatevski
hrzlatevski hrzlatevski
  • 03-02-2019

Data given:

F=100N

Δx=6m-2m=4m

A=?

Formula needed:

A=F×s

Solution:

A=100N×4m

A=400J

Answer Link

Otras preguntas

What instigated the United State's decision to launch an attack on Iraq in 2003?
Can you run for president if you were not born in the us
How do you solve for x? 5e^x+3=18
you and your brother went to dinner at pasta palace. you ordered a meal for $6.35: your brother ordered a meal for $7.50: the sales tax rate was 7.25% and you l
What is the mass of an empty film canister?
A forensic odontologist examines the teeth of a skull and finds no baby teeth, no wisdom teeth, scarring in the rear jawbone, no dental diseases or tooth degene
the reciprocal of 5 plus the reciprocal of 7 is the reciprocal of what number?
HBr + KOH mc001-1.jpg KBr + H2O In this reaction, the acid is
The ________ is an elevational point that divides an entire continent into large drainage basins.
What type of portfolio might a young investor who is not afraid of risk choice?