Seudónimo Seudónimo
  • 02-06-2018
  • Mathematics
contestada

It takes 10 workers 24 hours to do a job.
Fill in the chart.

It takes 10 workers 24 hours to do a job Fill in the chart class=

Respuesta :

biggersis1968p8xgn0 biggersis1968p8xgn0
  • 02-06-2018
5 in 48 
10 in 24
20 in16
30 in12
40 in 8
50 in 4
Answer Link

Otras preguntas

Someone plssss help meeee !!!! How much energy is required to vaporize 112 g of water? ???
A cable repair person has 7.9 meters of wire. Suppose each meter of the wire weighs 3.2 ounces. Find the weight of the wire.
Use the algebra tiles to help you solve the equation 3x - 5 = 7.
The accepted speed of sound at atmospheric pressure and 0 *C is 331.5 m/s. The speed of sound increases 0.607 m/s for every *C. Calculate the speed of sound at
additive inverse of -33​
De paseo While Hernán shops, Laura and Silvia are walking around the city. Fill in the blanks in their conversation with the verb tener and the words from the b
Write the length of the radius if the diameter is 6 centimeters
1/4 x 1/6 x 1/12= What fraction did Phil eat of the pizza
4. What was the main result of the French and Indian War?
Which number is greater than 555,621,000? A. 5.0 x 10 B. 6.2 x 10 C. 5.55621 x 10 D. 9.99 x 10